Panel Upgrades & Service Changes.
100-amp panels can't keep up with modern loads — EV chargers, heat pumps, and induction cooktops pull more than they were designed for. We upgrade to 200 or 400 amps, replace the meter base if Duke Energy requires it, and label every circuit.